DOUGLAS COUNTY, Ga. — Triple Team Traffic says all lanes are now open after a big rig fire cleanup in Douglas County.
On Wednesday afternoon, Triple Team Traffic issued a “GRIDLOCK ALERT” in Douglasville on Interstate 20 westbound of Highway 92 at exit 37.
[DOWNLOAD: Free WSB-TV News app for alerts as news breaks]
🔴 GRIDLOCK ALERT Douglasville: I-20/wb e. of Hwy. 92 (Exit 37), big rig fire cleanup. Only left lane open.
— 🔥Fireball Turnbull 🚁 (@DougTurnbull) June 5, 2024
Here is where the jam starts: Fult. Ind. Blvd. (Exit 49). Take Hwy. 78 or Hwy. 166. #ATLtraffic @wsbradio @wsbtraffic pic.twitter.com/15v72Jubjd
Only one lane was open.
Triple Team Traffic Chopper flew over the scene of the fire rig cleanup on Wednesday afternoon.
The traffic jam started at Fulton Industrial Boulevard at exit 49.
Triple Team Traffic suggested that drivers take Highway 78 or Highway 166.
TRENDING STORIES:
- 15-year-old Troup County boy in critical condition after shooting 10-year-old sister
- DeKalb art teacher arrested months after video showing him slamming 7-year-old against wall
- Disturbing surveillance video shows shootout at metro Atlanta wings restaurant over $1
There are no details on injuries or the cause of the fire.
Triple Team Traffic said while lanes are back open, delays still remain.
[SIGN UP: WSB-TV Daily Headlines Newsletter]
IN OTHER NEWS:
©2024 Cox Media Group